KYOCERA TCL Solar begins operation of Japan’s largest 13.7MW Floating Solar Power Plant
Completion ceremony for plant on Yamakura Dam reservoir attended by governor of Chiba Prefecture
27 March 2018
Kyoto/London − Kyocera Corporation (President: Hideo Tanimoto; herein “Kyocera”) and Tokyo Century Corporation (President & CEO: Shunichi Asada; herein “Tokyo Century”) announced today that Kyocera TCL Solar LLC (herein “Kyocera TCL Solar”) has started operation of Japan’s largest*1 13.7 megawatt (MW) floating solar plant this month. Located on the Yamakura Dam reservoir in Ichihara, Chiba Prefecture, the Company held a completion ceremony on March 20 with Kensaku Morita, the Governor of Chiba Prefecture. Kyocera TCL Solar is a joint venture of Kyocera and Tokyo Century established in 2012 to promote large-scale solar projects.
The plant was constructed over the surface of the reservoir, which is managed by the waterworks bureau of Chiba Prefecture for its industrial use. With 180,000m² (over 44 acres) of surface area, 50,904 Kyocera solar modules were installed to generate an estimated 16,170 megawatt hours (MWh) per year ― enough electricity to power approximately 4,970 typical households*2. All power generated is sold to TEPCO Energy Partner, Incorporated. The project was originally initiated by the Public Enterprises Agency of Chiba Prefecture seeking companies to help reduce its burden on the environment.
Since its establishment, Kyocera TCL Solar has constructed 61 solar power plants*3 across Japan including the nation’s largest floating solar project, the 13.7MW plant at Yamakura. The Company has developed seven floating solar power plants using Japan’s fresh-water dams and reservoirs rather than agricultural land, for it is becoming more difficult to secure tracts of land suitable for a utility-scale power plant.
Kyocera TCL Solar, Kyocera and Tokyo Century, will remain committed to promoting renewable energy as well as contributing to environmental protection and the creation of a sustainable society.
Outline of Yamakura floating solar power plant
Location | Yamakura Dam (Ichihara, Chiba Prefecture, Japan) |
---|---|
Operation | Kyocera TCL Solar LLC |
Area | Approx. 180,000m² |
Maximum output | Approx. 13.7MW |
Solar modules | 270-watt Kyocera modules (50,904 modules in total) |
Expected annual power generation | Approx. 16,170MWh/year Electricity generated is sold to TEPCO Energy Partner, Incorporated |
Start of operation | March 5, 2018 Construction started in December 2015 |
Design & construction | KYOCERA Communication Systems Co., Ltd. |
Maintenance | KYOCERA Solar Corporation |
Company Overview
Company name | Kyocera TCL Solar LLC |
---|---|
Location | Chiyoda-ku, Tokyo, Japan |
Shareholders | Tokyo Century Corporation (81 %) Kyocera Corporation (19 %) |
Established | August 2012 |
Business outline | To sell power produced from solar power generation |
*1 Japan’s largest floating solar power plant in terms of output among those currently in operation. Claim is based on research by Kyocera TCL Solar LLC (as of March 20, 2018).
*2 Based on average annual use of 3,254.4kWh per household. Source: Federation of Electric Power Companies of Japan (Graphical Flip-chart of Nuclear & Energy Related Topics 2015)
*3 Total of the plants in operation as of March 20, 2018.
For more information about Kyocera solar energy: https://global.kyocera.com/prdct/solar/
For more information about Kyocera: www.kyocera.eu
Press Material
- Press Release (pdf) (389.51 KB)
- Press Photo (jpg) (443.97 KB)
- Press Photo (jpg) (967.95 KB)
Contact for technical information:
Mr. Kenichi Hara
E-Mail: webmaster.pressgl@kyocera.jp
Contact for journalists
Daniela Faust
Manager Corporate Communications
E-mail: daniela.faust@kyocera.de
Latest News
- Kyocera Receives Japan’s Environment Minister’s Award for Record 9th Consecutive Year
- Kyocera to Participate in Self-Driving Bus Test Project on JR East BR Lines
- Innovative, durable, and beautiful: Kyocera presents high-quality kitchen tools demonstrating the advantages of its ceramic technology at the BBC Good Food Show in Birmingham from November 29 – December 2, 2018.
- Inamori Foundation Awards the 34th Kyoto Prize to Scientists and Artist in the Fields of "Advanced Technology", "Basic Science", and "Arts and Philosophy"
- KYOCERA reflects on integral philosophy of Founder Dr. Kazuo Inamori to respect the divine and love people
- Kyocera wins CEATEC Award for “Amcenna” IoT Antenna
- KYOCERA celebrates 27 years of sustainability at the core of operations
- Kyocera wins Supplier Award
- Kyocera presents a firework display of innovations at the electronica 2018
- KYOCERA introduces reliable, Waterproof Branch Connector for harsh conditions of automotive electronics
- KYOCERA to Build New Manufacturing Plant in Kanagawa, Japan for Conductive and Insulation Pastes
- KYOCERA steps up expansion strategy with Czech acquisition
- KYOCERA Group to Exhibit Innovative Technologies and Products at CEATEC JAPAN 2018 Tradeshow Oct. 16-19
- KYOCERA introduces a new 12.1” WXGA LCD Module for Off Highway Applications
- KYOCERA at AMB 2018: a world premiere and a number of new products